No. Project Description Owner
1 EPCC for a 275kV/33kV Substation, Switchyard and Transmission, MCKIP Kuantan, Pahang. Beibu Gulf Holding (Malaysia) Sdn Bhd
2 Supply, Construction and Commissioning of One Unit 33kV Substation. De Long Global (M) Sdn Bhd
3 Electrical & ELV Works for (1) 1 single storey warehouse with 2 storey office; (2) 1 electric substation; (3) 2 guard houses; and (4) 1 pump room on PT 4 for Daikin Malaysia Sdn Bhd. Daikin Malaysia Sdn Bhd
4 Design & Built for the Proposed Renovation Fitout for Zurich Life Insurance Malaysia Berhard and Zurich General Insurance Malaysia Berhad. Zurich Insurance
5 Extra Low Voltages works at lot (PT 2295) Kawasan Bandar VI, Daerah Melaka Tengah, Melaka. YTB Impression Sdn Bhd